The importance of budget quotation is needless to say, and the owners also know its importance. If there is no general plan in the early stage, or if they are not clear about their own decoration needs, it will be quite troublesome for the later construction and decoration, and it is easy to overspend. For some people, they have spent a lot of money to buy a house, so naturally, they want to use the most cost-effective price to gain the highest quality. Let's take the common house type of 100 ㎡ as an example to understand the latest quotation in Wuhan
project 1: basic engineering
project type includes content, process method, total amount (yuan)
shoveling the wall (gypsum ash) 1320.00
removing the wall and floor tiles 4590.00
wall blank base treatment 660.00
removing the brick wall (120 mm) 245.00
light brick wall (120 mm double-sided plastering) 735.00
opening after removing the wall Paint 210.00
solid wood floor removal (including keel) 1120.00
masonry wall opening 414.40
old furniture removal 2000.00
old house toilet excavation 800.00
item 2: Waterway Circuit engineering
strong and weak current construction (lump sum price) 8050.00
waterway construction (lump sum price) 2200.00
balcony water outflow 300.00
Project III: guest restaurant and aisle
emulsion paint base treatment (putty) 2820.00
emulsion paint 1128.00
gypsum board flat ceiling 140.00
gypsum board linear light trough ceiling 2550.00
gypsum board shaped ceiling 575.00
general specification of floor tiles (500 × 500< Size ≤ 800 × 800) 2494.00
TV background wall shall be quoted according to specific design drawings, Please confirm the price before signing the contract 800.00
item 4: primary bedroom
emulsion paint base treatment (putty) 1460.00
emulsion paint 584.00
item 5: secondary bedroom
emulsion paint base treatment (putty) 940.00
emulsion paint 376.00
item 6: study
emulsion paint base treatment (putty) 1020.00
emulsion paint 408.00
item 7: kitchen
general specification of wall tiles (300 × 450< Size ≤ 300 × 600) 1250.00
common specification of floor tiles (size 300 × 300) 360.40
kitchen waterproof treatment 360.00
kitchen and bathroom package pipes 162.50
hallway stone paving 37.50
item 8: bathroom
wall tile general specification (300 × 450< Size ≤ 300 × 600) 1000.00
common specification of floor tiles (size 300 × 300) 201.40
toilet backfilling and surface leveling 266.00
toilet waterproof treatment 900.00
kitchen and sanitary package pipes 338.00
door stone paving 25.00
toilet sewer protection works small brick enclosure and coarse sand backfilling. 200.00
general specification of wall tiles (300 × 450< Size ≤ 300 × 600) 1100.00
common specification of floor tiles (size 300 × 300) 265.00
toilet backfilling and surface leveling 350.00
toilet waterproof treatment 990.00
kitchen and sanitary package pipes 338.00
doorway stone paving 25.00
toilet sewer protection works small brick enclosure and coarse sand backfilling. 200.00
Item 9: balcony
emulsion paint base treatment (putty) 400.00
emulsion paint 160.00
General specification of floor tiles (200 × 200< Size ≤ 800 × 800) 530.00
common specification of wall tiles (300 × 450< Size ≤ 300 × 600) 500.00
balcony waterproof treatment 675.00
production of cement board for water pipes 338.00
item 10: miscellaneous
material upstairs cost 300.00
material transportation cost 300.00
indoor garbage removal cost 300.00
lamp installation 200.00
sanitary ware installation 150.00
hardware installation 100.00
ground fastening 300.00
item 11: hardware installation 100.00
foreman 360 third party Supervisor (required) Foreman 360 third-party decoration supervision service, escort for your decoration! During the whole process, 8-12 node inspections and acceptance reports are issued, and the third-party supervision of the decoration payment is cooperated. If the acceptance is unqualified, the payment is refused. In order to minimize the risk of your decoration this time, the foreman 360 reminds you to be sure to choose! 1299.00
Star foreman service charge according to the foreman's construction technology and service level, foremen above diamond level will charge 1000, 2000 and 3000 yuan of star foreman service charge in addition to the project payment for each major level. 1000.00
workers' insurance premium direct cost of the project × 1% (all accidents of construction personnel in the construction process have nothing to do with Party A) item 0.01
tax (project direct cost + machinery loss cost + insurance premium) × (0.038 to 0.049) 0.01
finally, Wuhan home decoration network provides decoration bidding services for the majority of Wuhan owners. You only need to enter the decoration bidding page of Wuhan home decoration network, fill in your name, phone number, community and other decoration information, and then you can participate in the bidding. The platform can select 3 to 4 suitable decoration companies to measure rooms for free according to your requirements, formulate quotation schemes, and enter the details http://whjzw.net/zb/。